Tuesday, June 2, 2015

Metro Hall, go-ahead to the trains now run free – The Morning

Today opens its doors the stop line 1 subway station in Naples in Piazza Municipio. Ends up the time of visits: Passengers now can use the new metro stop at City Hall station, where trains will conduct regular stop.

To mark a decisive step in the progress of the network of rail transport, the Company Neapolitan Mobility has also made a note of celebration and for those accessing the new stop, and only for today, offers the possibility of a free ride. In addition, the Neapolitan Mobility Company has launched an initiative: an info point that will be placed in the lobby near the station turnstiles and will feature modern design in glass and steel and is recognizable by the logo of the traditional “corporate” business.

“Presidiato personnel Anm, from Monday to Friday from 7 to 20.30 – they know the company – wants to be a frame of reference and reception where frequent travelers but also tourists can find material communication and additional information on travel tickets and season tickets, schedules and frequencies rides, parking lots and how to use the stop in satin and in structure, initiatives in the city and events related to art stations. “

the opening of City Hall in all the stations and on board the train is full also updating the directional signs of Line 1 is Garibaldi-Piscinola. The new maps in the dock, the lines of direction in the station and on trains, in lifts and along the transit routes, provide information for the whole route in operation and enhance accurate to better use of the other lines of the system integrated rail transport, the park and ride and the main places and public utilities in the vicinity of metro stations and cable cars.

As for the number of trains and waiting times substantially, there will be news. Eight vehicles at the disposal of the fleet, plus two reserves. Ten minutes average waiting. To get to seven minutes, as promised by the mayor Luigi de Magistris also the inauguration of the new square and the new metro, will have to wait after the summer. With the reopening of the school trains should get to be ten, with two in reserve, thus reducing waiting times: 7:00 to 8:00 minutes.

With the opening of the new Town Hall also technological equipment latest generation makes it “an example of cutting-edge remote management of systems and security systems” commented dall’Anm. The system includes 16 lifts (escalators), 5 lift (elevator), one of which from the plane entrance at street level, four batteries of turnstiles and now two active outputs are governed through the remote control system “runs out”, both locally and from the operations room of the Hills Aminei. The two benches agents with CCTV, will monitor and manage in real time the sophisticated sprinkler system, the public address and emergency feeding of the airline and of the input signals for the trains.

Two vending machines to purchase tickets, (also authorized to issue tickets Anm), full kit of services to users in this new station.
     
     
          & copy; ALL RIGHTS RESERVED

->
 
     
     
     

 Tuesday, June 2, 2015 – 08:52 Last agg .:
 
 10:31
 

© ALL RIGHTS RESERVED

LikeTweet

No comments:

Post a Comment